Maintenance
Emergency Maintenance to 911
Resolved Jul 14 at 02:00pm EDT
We have received notice from our partner at 911 as follows:
Northern 911 will be performing an emergency web application firewall upgrade.
Scheduled Start Time: Monday, July 14, 2025, 02:00 PM ET
Estimated End Time: Monday, July 14, 2025, 03:00 PM ET
During the maintenance, the services may not be available for 30-60 seconds.
This is required to enhance the overall security and stability of our web application firewall.
Connectivity tests will be ...
Voice system upgrades at our datacenter
Resolved Jul 04 at 12:00am EDT
We will be performing a minor update to our core voice servers.
There is no downtime expected.
Standard Maintenance Window - Voice Systems
Resolved Aug 01 at 12:00am EDT
We will be performing basic maintenance on our voice servers. There may be a minor interruption when performing restarts of the servers.
Test of Emergency Power Back up systems
Resolved Sep 17 at 02:00am EDT
Our data centre will be conducting a live Generator Transfer Test September 17, 2025 at 2:00 AM EDT until 7:00 AM EDT.
During this time, they will be testing their systems to verify that the load is successfully transferred to our backup generators by the Automatic Transfer Switch (ATS).
Moreover, that the generators will carry the load for an extended period of time.
Our data centre host is running this test to make sure they are fully prepared for an actual commercial power outage ...
Back up emergency power test at our voice datacenter.
Resolved Sep 05 at 02:00am EDT
Our data centre will be conducting a live Generator Transfer Test September 5, 2025 at 2:00 AM EDT until 7:00 AM EDT.
During this time, they will be testing their systems to verify that the load is successfully transferred to our backup generators by the Automatic Transfer Switch (ATS).
Moreover, that the generators will carry the load for an extended period of time.
Our data centre host is running this test to make sure they are fully prepared for an actual commercial power outage i...